Client
Tonnage
450T - Steelwork & Platework
Pays
Cuba
Année
2020

A propos de ce projet

Delivering to Cuba required strict quality control and on-time execution.

The project scope included manufacturing drawings, manufacture of steelwork and platework. Trail assembly included all steel and platework, mechanicals, piping, access walkways and electrical racking, to reduce site manhours and ensure seamless fit-up. Once disassembled, the plant was painted, packed onto Viva’s skid system, containerised and shipped to Cuba, with Viva providing site supervision for efficient installation.

Points forts du projet

  • Off-site assembly of entire plant
  • Site supervision during installation ensured trouble free installation in Cuba

Avantage pour le client

The full process plant assembly before shipment resulted in a perfectly executed project in a remote location.