Viva Engineering delivered Africa’s first Epigen-painted LFCU Surge Tank, completing the full scope from shop detail drawings and fabrication of bolted tank components to rubber lining and abnormal transport to site. The bin was assembled and hydro tested in our off-site assembly yard with zero rework before corrosion protection.
This project reflects Viva’s commitment to quality and on-time delivery to ensure client project success.
Zero rework on site through off-site assembly and quality assurance.