Client
Tonnage
100T Platework
Country
South Africa
Year
2017

About this project

This project combined structural design and manufacturing scopes to reduce the client’s engineering resource load, with Viva Engineering and our design team completing all interface engineering, structural design and access layouts from only basic data sheets and layout sketches.  

The scope included 9 bolted and rubber lined tanks, each 4m diameter and 6m high. Tanks were transported to site with multiple abnormal loads in a specific sequence to reduce site cranage. Top of tank steelwork was designed to support the tank agitators and provide maintenance access. 

Project Highlights

  • Structural design and interface engineering 
  • Reduced client engineering resource requirements 
  • Bolted tank expertise for cost-effective site installation 

Client Benefit

Reduced engineering hours and cost-efficient bolted tank delivery.